Discover
Our Works

With projects completed across various locations and conditions, we’ve built a proven records of delivering lasting results no matter the scale or complexity.

Location

Projects Across Indonesia

Our work has reached several key regions across Indonesia, with projects primarily based in Sulawesi and Java. Each site reflects our commitment to consistent results and long-term value for our clients. As we continue to grow, we’re expanding our reach to serve more regions nationwide.

Active Regions
(Sulawesi & Java)
0 +
Delivery Rate
0 %
Upcoming Projects
0

Projects

Our Latest Work

Projects

Our Previous Works

Tallo River Dredging Project

2023

Dredging operations were carried out to remove sand sediment from the Tallo River.
 
The dredged material was repurposed for land reclamation and construction in the surrounding Makassar area.
 
Client: PT Putra Jaya

Danau Tempe Revitalization Project

2018 – 2020

Lake revitalization works that created nine small artificial islands using dredged sand and vegetation material.
 
The islands act as sediment containment zones, and the dredging increased lake depth to reduce flood risk in the Sidrap–Makassar area.
 
Client: PT PP Persero Tbk

PLTU Batang Silt Removal Project

2023 - 2024

Ongoing silt-removal operations are aimed at preventing sediment accumulation and maintaining required water depths to protect the power plant’s cooling water system from sediment intrusion.
 
This phase builds on earlier de-siltation campaigns to ensure continuous, reliable plant operation.
 

Client: Wakachiku Construction Co Ltd

Makassar New Port Dredging Project

2017

Dredging operations for the Makassar New Port Package B extension, covering the Sandkey CW and Sandkey CY areas, to deepen navigation channels and berth pockets as required by the port expansion.
 
Client: PT PP Persero Tbk

PLTU Batang Silt Removal Project

2021 - 2022

Follow-up silt-removal works were conducted to maintain optimal intake conditions and stable flow to the plant’s cooling and intake systems.
 
These activities supported long-term operational reliability.
 

Client: Wakachiku Construction Co Ltd

Makassar New Port Installation Silt Curtain Project

2017

Installation of marine buoys and floating mooring lines to support port operations and safe vessel navigation during and after the development works.
 
Client: PT PP Persero Tbk

PLTU Batang Silt Removal Project

2020

Initial de-siltation project involving the removal of sediment accumulated within the intake head and associated pipelines.
 
Specialized marine and dredging services were deployed to clear intake structures and prevent sediment-related blockages that could disrupt power generation at the Central Java Power Plant.
 

Client: Wakachiku Construction Co Ltd

Cirebon Channel Dredging Project

2016

Channel dredging and reclamation works to maintain and deepen the dock area, and turning circles near the propylene zone at Pertamina RU VI Belongan.
 
The operation enhanced navigational depth and safety using a 1,500 CBM TSHD, grab dredger and hopper barge to restore optimal channel conditions in the Cirebon–Indramayu region.
 
Client: PT Qintani Mustika Teknikindo Indonesia
 
End Client: PT Pertamina (Persero) RU VI Belongan